Gunnebo Speedstile Fl Installation Manual
is available in several configurations, most notably the (square ends) and EV (rounded ends) versions. Standard Configuration Wide (ADA) Configuration Passage Width Cabinet Length 1500 mm or 1925 mm 1500 mm or 1925 mm Cabinet Height Power Supply 230VAC 50Hz (115VAC 60Hz available) 230VAC 50Hz (115VAC 60Hz available) Power Rating 60VA Standby / 300VA In Operation 60VA Standby / 300VA In Operation 3. Installation Step-by-Step
Measure the gap between panels in a standard lane (the nominal gap should be exactly uniform from top to bottom).
Verify that the walkway width matches your model specifications (typically for standard lanes and for wide/ADA lanes). Step 2: Drilling Anchor Points Drill the anchor bolt holes using a masonry drill bit to a depth of
Cause: The fire loop circuit is broken or an actual alarm has tripped. gunnebo speedstile fl installation manual
Manually test that the glass wings move freely without rubbing against the cabinet body. Switch on the main AC circuit breaker.
The keyword search for often leads to outdated third-party sites. For the official, model-specific PDF:
Gunnebo SpeedStile FL is a high-performance speed gate designed for rapid pedestrian throughput with medium security. Installation requires precise site preparation and alignment to ensure the safety sensors and motorized wings function correctly. Critical Installation Requirements Foundation: The floor must be finished, flat, and level to within plus or minus across the entire footprint. Concrete Specification: Use concrete with a minimum resistance of fck (cube) 30N/mm² Dimensions: A minimum foundation depth of is required, with a bolting depth of at least Cable conduits must rise at least is available in several configurations, most notably the
This is the most critical technical step. The unit requires a stable power supply and connectivity to the external access control readers.
Once mechanical and electrical installations are complete, follow this testing sequence: Initial Power-On
This section synthesizes the core mechanical and electrical procedures found within the . Verify that the walkway width matches your model
Turn off the main circuit breaker. Verify that the wings immediately fail-safe (open fully in the direction of egress via the internal battery backup or mechanical storage springs). 7. Troubleshooting Common Installation Errors Probable Cause Corrective Action Wings hit each other when closing Cabinets are out of square or unlevel. Re-shim and realign the chassis bases. Constant tailgating/sensor alarms Optical sensors are misaligned or dirty. Clean sensor lenses; check internal alignment LEDs. Lane does not respond to card reader Incorrect wiring or incorrect signal type. Verify dry contact output from reader to logic board. Wings close slowly or judder Low voltage supply or loose drive belts. Measure input voltage at PSU; adjust belt tension.
This guide outlines the complete installation process for technicians and facility managers. 1. Pre-Installation Requirements
Use a chalk line or laser level to mark the center line of the security lane on the floor.
Ensure the turnstile mechanism is powered off and manually locked in the center position.